Ganda Bolt Clamps
Rincian
1. Beungeut jero boga ridges gripping dual
2. Bolts lugs bertulang pikeun nyegah bending kaluar tina alignment
3. Ukur selang OD akurat saméméh mesen clamps
4. Nilai torsi pikeun clamps dumasar kana bolts garing.Pamakéan pelumas on bolts bakal mangaruhan adversely kinerja clamp
Daptar ukuran clamps ganda Bolt sapertos di handap ieu:
Ngaran | kodeu | ukuran | ukuran hurung | Catetan | Warna |
clamp baud ganda | DB | SL-22 | 20-22 mm | Tanpa sadel | Koneng |
clamp baud ganda | DB | SL-29 | 22-29 mm | ||
clamp baud ganda | DB | SL-34 | 29-34 mm | ||
clamp baud ganda | DB | SL-40 | 34-40 mm | ||
clamp baud ganda | DB | SL-49 | 40-49 mm | ||
clamp baud ganda | DB | SL-60 | 49-60 mm | Saddles baja karbon | |
clamp baud ganda | DB | SL-76 | 60-76mm | ||
clamp baud ganda | DB | SL-94 | 76-94 mm | ||
clamp baud ganda | DB | SL-115 | 94-115 mm | ||
clamp baud ganda | DB | SL-400 | 90-100mm | ||
clamp baud ganda | DB | SL-525 | 100-125mm | Saddles beusi Malleable | Bodas |
clamp baud ganda | DB | SL-550 | 125-150mm | ||
clamp baud ganda | DB | SL-675 | 150-175mm | ||
clamp baud ganda | DB | SL-769 | 175-200mm | ||
clamp baud ganda | DB | SL-818 | 200-225mm | ||
clamp baud ganda | DB | SL-988 | 225-250mm | ||
clamp baud ganda | DB | SL-1125 | 250-300mm | ||
clamp baud ganda | DB | SL-1275 | 300-350mm |
6.instruksi pikeun clamps baud ganda Firstly, pariksa beungeut tungtung pipe na assure yén pipe téh lancar, lajeng aligning dua sapotong clamps terus selapkeun baud tur sambungkeun aranjeunna, tungtungna leungeun tighten kacangan pastikeun oval salajengna baud lengkep fits kana liang baud. .Punten pastikeun anjeun nganggo rengkuh.
7.MILL TEST LAPORAN
Katerangan: clamps baud ganda
Katerangan | Sipat Kimia | Sipat fisik | |||||
Lot No. | C | Si | Mn | P | S | Kakuatan regangan | Elongation |
ALL PALLET | 2.76 | 1.65 | 0.55 | Kirang ti 0,07 | Kirang ti 0,15 | 300 Mpa | 6% |
8. Sarat pembayaran: TT 30% prepayments produk saméméh ngahasilkeun sarta TT kasaimbangan sanggeus narima salinan B / L, sadaya harga dinyatakeun dina USD;
9. Packing jéntré: Dipak dina cartons lajeng on pallets;
10. Tanggal pangiriman: 60days sanggeus narima 30% prepayments sarta ogé confirming sampel;
11. kasabaran kuantitas: 15%.